"In my mind the traffic signal needs to go first," Hall County Planning Commission Vice-Chairwoman Susan King said at the commission's November 16 meeting, as AccessNorthGA reported. She was talking about the intersection of Union Circle and Spout Springs Road. Residents who spoke against a proposed 119-unit neighborhood on Spout Springs Road that evening named that intersection as their biggest concern.
For anyone comparing homes in south Hall this winter, Union Circle is also the best place to start reading the map. North of it is Phase I of the widening, designed as four divided lanes. South of it, the road is still two lanes, and the widening there is planned on a timeline that runs toward the end of the decade. Hall County's resale market has loosened this fall while the new homes and the new road are still years away, so a buyer has more bargaining room on an existing house today than at any point in the past year. Where that house sits relative to Union Circle decides how much roadwork comes with it.
The 119-unit proposal comes from DCCM, a Houston-based developer with a Gainesville regional office. It covers roughly 33 acres at 6651 Spout Springs Road, southeast of Flowery Branch, with 65 townhomes and 54 detached homes. The site now holds a single-family house of more than 4,500 square feet and an accessory building of more than 2,600 square feet, both built in 1998 and both slated for removal. County staff recommended approval with conditions because the plan matches the "Suburban Neighborhood Medium Density" designation in the county's Comprehensive Plan, according to AccessNorthGA.
During the hearing, King asked the county's traffic engineer when a signal would go in at Union Circle without the development. The engineer estimated five years of growth. King then moved to recommend approval, adding that DCCM would get no accommodations and could pay for the signal. The four-member commission split 2-2, so the proposal goes forward with no recommendation.
For a buyer, the timing in that exchange matters more than the vote. Without the development, the county's own traffic engineer put a signal at Union Circle about five years of growth away.
The Georgia Department of Transportation tracks Spout Springs Road as two projects that meet at Union Circle. Phase I is the 3.2-mile section from I-985 to Union Circle, widened from two lanes to four divided lanes with a raised median and sidewalks. GDOT's project page lists it at 97.07 percent complete.
Phase II continues south from Union Circle to just past State Route 347, which is Friendship Road. The plan widens it from two lanes to four, with a 20-foot raised median and sidewalks, and changes or removes median openings and intersections along the way. GDOT logged right-of-way authorization on November 13, 2026. Construction stands at 0 percent, with no contractor named. Hall County's 2026 State of the County update said right-of-way acquisition and design for Phase II were underway and would continue into 2026.
The Gainesville-Hall MPO's transportation improvement program sheet for the project, amended May 12, 2026, also adds a multiuse path. It lists the timeline this way.
| Phase II milestone | Programmed year |
|---|---|
| Right-of-way | 2027 |
| Utilities and construction | 2028 |
| Open to traffic | 2030 |
These are planning years, and planning years can move. As things stand, a house that fronts or feeds onto Spout Springs south of Union Circle faces a few more years on a two-lane road, followed by a construction period.
Hall County's 2025 work in south Hall also included two sewer projects. The county cut the ribbon on the Friendship Road Sewer Project, which added 5.2 miles of sewer line along that corridor. It also broke ground on the Spout Springs Water Reclamation Facility expansion, which will raise the plant's capacity from 750,000 gallons a day to 1.6 million. The county says that expansion will let it keep offering wastewater service to nearby homes and businesses for the next 10 to 15 years.
The two schedules run on different clocks. The plant expansion is planned around 10 to 15 years of service, and the Phase II widening south of Union Circle is programmed to open in 2030. The DCCM site shows what that looks like on one parcel, where a single house on about 33 acres is proposed to become 119 homes.
DCCM's was one of four south Hall proposals the planning commission heard on November 16. Taken together, they give a rough price and timing guide for new housing in this part of the county.
All four proposals, including DCCM's, go to the Hall County Board of Commissioners at its December 10 voting meeting, 6 p.m., at the Hall County Government Center, 2875 Browns Bridge Road in Gainesville.
Inside Flowery Branch city limits, the City Council denied rezoning and variance requests on April 2, 2026, for The Ridge at Lott Creek on Hog Mountain Road. AccessNorthGA reported that its latest version priced single-family homes in the mid-$500,000s.
Set those prices against today's sales. A detached home at $450,000 to $500,000, about two years away, would sit above the county's current single-family median. A rental townhome at $2,295 a month is a useful comparison point for anyone deciding between renting and buying an attached home.
The Georgia REALTORS Local Market Update for Hall County gives single-family figures for October 2026, compared with October 2025.
| Single-family, Hall County | Oct 2025 | Oct 2026 |
|---|---|---|
| Median sales price | $440,000 | $423,395 |
| Closed sales | 173 | 152 |
| Pending sales | 179 | 120 |
| New listings | 285 | 318 |
| Homes for sale | 811 | 951 |
| Months of supply | 4.6 | 5.2 |
| Days on market until sale | 57 | 61 |
| Percent of list price received | 97.3% | 97.5% |
The pending sales figure points furthest ahead. Contracts signed in October 2026 fell 33 percent from a year earlier while new listings rose 11.6 percent, so this winter's closings will come from a larger pool of homes. Sellers are still getting about 97.5 percent of list price, which suggests homes priced correctly are selling. With 5.2 months of supply and the median down 3.8 percent year over year, buyers have more time and more choices than they did last fall.
Townhomes and condos tell a similar story at a lower price. In October 2026, Hall County's median for attached homes was $305,990, down 4 percent from a year earlier, with 5.8 months of supply. These are county-wide numbers. Flowery Branch homes follow the same seasonal and rate pressures, but individual subdivisions along Spout Springs Road can run above or below the county median.
Combine the road timeline with the market and a few practical questions follow for any home off Spout Springs Road.
A home north of Union Circle, on the Phase I section toward I-985, sits on the part of the road designed for four lanes, a raised median and sidewalks. It is worth driving the route from its subdivision entrance at rush hour before you make an offer, so you know how the median affects your daily trips.
A home south of Union Circle, toward Friendship Road, comes with the 2028 construction and 2030 opening dates on the GHMPO program sheet. If you plan to live there through the end of the decade, that is commute time to account for, and you would be living there when the road opens. If you might sell sooner, consider how a road under construction would look to your buyers.
For any home whose daily route goes through Union Circle, the county traffic engineer's five-year signal estimate is the most specific planning figure available today.
Finally, look at the open land near a listing. The sewer expansion is designed for 10 to 15 years of service, and the November 16 agenda shows that pastures and large lots along this corridor are being proposed for new neighborhoods.
Is the Phase II widening fully funded and scheduled? GDOT's project record shows right-of-way authorization on November 13, 2026, with no construction contractor yet. Hall County's July 2025 SPLOST IX referendum plan listed Phase II construction among the projects proposed for funding. The GHMPO sheet shows construction in 2028 and opening in 2030.
When will the Board of Commissioners decide on the 119-unit Spout Springs proposal? It is on the December 10 agenda at 6 p.m. at the Hall County Government Center, along with the other three south Hall proposals.
Do new homes in south Hall cost more than resale? The Chestnut Mountain proposal was priced at about $450,000 to $500,000 and is about two years from completion. Hall County's single-family resale median was $423,395 in October 2026.
For a home along Spout Springs Road, which side of Union Circle it sits on is a good place to start, and from there you can see how it fits the roadwork schedule and the open land nearby. If you're weighing a home in Flowery Branch or elsewhere in south Hall this winter, Jacklyn Zuniga can look at a listing against those timelines with you and help you decide how much the extra choice in today's market is worth to you. Let's Connect through the Flowery Branch neighborhood page or the buyer resources.